Our team handled the electrical works including 1st, 2nd, and 3rd fixes for all trades including power, lighting, and low current systems such as Fire, CCTV, Structured Cabling, and Public Address.
High Standard Green Offices Building, MEA Call Centers, Offices, and Dormitories. The project is composed of 4 Basements, 1 Lower GF, 1 Upper GF, 3 Upper Floors, and 2 Roof Tops.